Phase 2B Bridge Deck

LOCATION: Namibia

VALUE: N/A

The casting of the Phase 2B bridge deck marked a significant milestone in the development of the freeway connecting Windhoek and Hosea Kutako International Airport. The 97-metre-long structure required a carefully coordinated concrete pour lasting more than 18 hours, followed by several hours of finishing work. Ohorongo CEM II B-V 42.5N cement was used to achieve the specified concrete performance, contributing to a structure designed to meet the demands of this important transport infrastructure project.

Bridge deck length: 97 m
Bridge deck width: 18.4 m
Concrete used: 1,350 m³
Reinforcing steel: 190.5 tonnes
Required concrete strength: 50 MPa
Ohorongo cement: CEM II B-V 42.5N
Concrete suppliers: Zhongmei, Namibia Construction & Dynamic Concrete Solutions
Concrete pumps: 4
Pour duration: 4:00 AM – 10:15 PM

Share the Post:

RECENT Posts